Once things are up and running, it might become be possible for anyone to submit setups as long as they meet certain standards and naming conventions. It is likely, that the SK collection will be finished and available first and afterwards the other collection is worked on which will become available in batches.Īs a preview, head to and you can try out the SK setups. that one will know exactly from where to start if one plans on updating an existing setup). Because updating setups is a business without end due to the release of new VASL versions, some consideration it put on thoughts on documentation/designation as to make updates more easy in the future (i.e. This latter collection is mixed MMP and TPP, while the SK collection is systematic, running through all the SK scenario numbers. I have no idea about the time-table on that project. There are plans to update those as well (and as these versions are not that old, there is a solid base to start from). Then there is another collection which includes roughly 150 VASL setups stretching from versions v5.9.2 to v6.2.2. Most of them are very outdated, one of which included every scenario of the core modules among them - for VASL v4. More information on this year’s Rocks Glasses coming soon JScenario List is Up The Human Wave is only five weeks away As the excitement builds, we have posted the Scenario List, so be sure to take a look.
0 Comments
Leave a Reply. |
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |